Forums
New posts
Search forums
What's new
Articles
Latest reviews
Author list
Classifieds
Log in
Register
What's new
Search
Search
Search titles and first posts only
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Hunting
Coyote Hunting - From 10 Yards to over 1,000 Yards
Ramblings and Such From Hunting Coyote
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Bucklowery" data-source="post: 2523992" data-attributes="member: 69506"><p>Mr. Dave, after Westinghouse sold I went to college full time until I finished. I was going to school during the day and working 2nd shift. Then I cruised timber at Air Force base, then became a journeyman lineman.</p><p></p><p>I actually done all the different process and jobs and final assembly of some big generators. Some which are in China right now imagine that. Stacking cores and torque all those sheets together and then the crane guy setting it inside the frame vertically. He would reset cables and then lay it down horizontally for us to put in the coils. It was cool to watch. Then sliding in a 20 ton rotor, some pretty cool tricks. I got to be part of one generator that was tested after we built it. It is amazingly watching that huge rotor coming up to speed (3600 rpm) 60 hertz, the whole facility shook</p><p></p><p>Thanks </p><p></p><p>Buck</p></blockquote><p></p>
[QUOTE="Bucklowery, post: 2523992, member: 69506"] Mr. Dave, after Westinghouse sold I went to college full time until I finished. I was going to school during the day and working 2nd shift. Then I cruised timber at Air Force base, then became a journeyman lineman. I actually done all the different process and jobs and final assembly of some big generators. Some which are in China right now imagine that. Stacking cores and torque all those sheets together and then the crane guy setting it inside the frame vertically. He would reset cables and then lay it down horizontally for us to put in the coils. It was cool to watch. Then sliding in a 20 ton rotor, some pretty cool tricks. I got to be part of one generator that was tested after we built it. It is amazingly watching that huge rotor coming up to speed (3600 rpm) 60 hertz, the whole facility shook Thanks Buck [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Hunting
Coyote Hunting - From 10 Yards to over 1,000 Yards
Ramblings and Such From Hunting Coyote
Top