Thoughts on a long lead in a barrel

Do you believe a bore diameter lead that is 2-4" long would be detrimental to accuracy

  • Yes

    Votes: 7 77.8%
  • No

    Votes: 1 11.1%
  • Yes - but only at benchrest-class measurements

    Votes: 1 11.1%

  • Total voters
    9
  • Poll closed .

geocodyrgia

Well-Known Member
Joined
Oct 6, 2016
Messages
86
Location
Buford, GA
All, as I know there are a number of gunsmiths on the forum here, I would like to kindly ask for your input. I'm looking at project for reducing the wear in the throat of a barrel, but one of the limiting factors will be the requirement for not having rifling for the first 2-4". Essentially a long, non-tapered lead. I'm still investigating machining tolerances, obviously less is better, but if you have particular expectations you look for that input would be greatly appreciated as well.

So my question is: do you believe a bore diameter lead that is long enough to cover the area that becomes fire-cracked from hot/high pressure rounds would be detrimental to accuracy?

If accuracy in affected by a long lead and the lands/grooves really need to start in very close proximity to the ogive of the bullet as it's seated in the case, I will need to re-work my plans or at least make some changes to how it would be implemented.

Thank you all for any input!
 
That's effectively just the pre-wearing out of a barrel. Excessively long jumps provide room for randomness and in my experience are detrimental to the accuracy potential of a rifle/load combo.

If you want longer barrel life: consider bore coatings like chrome lining or nitriding, reduce the operating pressures (which usually amounts to reduce the total amount of powder being burned with each shot), increase the time interval between shots.
 
i think you will erode faster .. due to speed while impacting lands

i also think having the bullet still exiting the mouth as the pressure in case is increasing .. allows a better brass seal .. while holding all power in area until powder fully ingnited


also potentially dangerous with low neck tension .. primer could push out to that 4" and leave with excessive ingition capacity .. secondary detonation .???
 
Warning! This thread is more than 5 years ago old.
It's likely that no further discussion is required, in which case we recommend starting a new thread. If however you feel your response is required you can still do so.

Recent Posts

Top