Long Range Hunting Online Magazine


Go Back   Long Range Hunting Online Magazine > Hunting > The Basics, Starting Out


View Poll Results: How long does it take for a custom build based on assumptions provided in my post?
<6 weeks 9 9.57%
6 - 18 weeks 16 17.02%
18-24 weeks 19 20.21%
> 24 weeks 50 53.19%
Voters: 94. You may not vote on this poll

Reply

How long for a custom build?

 
LinkBack Thread Tools Display Modes
  #36  
Old 02-14-2014, 10:41 AM
Silver Member
 
Join Date: May 2010
Posts: 123
Re: How long for a custom build?

I didn't read this whole thread so sorry if this was already covered. Parts are the hold up. Krieger is 11 months out. I'm sure some of the action makers are the same. Added to this equation your smith and you may be be looking at a year+.
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes


Similar Threads for: How long for a custom build?
Thread Thread Starter Forum Replies Last Post
Custom/Semi-custom build question? 95huskers Long Range Hunting & Shooting 8 10-21-2011 02:43 PM
Custom long range, light weight Build - Which stock 300magman Rifles, Bullets, Barrels and Ballistics 13 05-03-2011 03:26 PM
custom .308 Build deerslayer13 The Basics, Starting Out 8 11-09-2010 11:14 PM
custom build tommyc279 Rifles, Bullets, Barrels and Ballistics 7 04-29-2010 09:41 PM
my first custom build yamadog The Basics, Starting Out 4 02-06-2010 03:41 PM

Current Poll
Do you archery hunt for elk?
YES - 32.09%
69 Votes
NO - 51.16%
110 Votes
Not yet, but I plan to. - 16.74%
36 Votes
Total Votes: 215
You may not vote on this poll.

All times are GMT -5. The time now is 09:14 PM.


Powered by vBulletin ©2000 - 2014, Jelsoft Enterprises Ltd.
Content Management Powered by vBadvanced CMPS
All content ©2010-2014 Long Range Hunting, LLC